WASTEWATER TREATMENT AND RECOVERY AT YAZBEK MEXICO


This case study describes the water filtration process at one of our recent facilities in Mexico.

YAZBEK (COMERCIALIZADORA Y DISTRIBUIDORA ZAY, S.A. DE C.V.) is a PES and Cotton dyeing house located in San José Iturbide, Guanajuato. The maximum daily flow that enters the factory is 3000 m3/d.

Before the installation of our water treatment plant, YAZBEK had a filtration system that consisted of: Chemical-Physical treatment, traditional biological treatment and Reverse Osmosis System. At the end of 2020, IDROSISTEM completed the assembly and installation of the New treatment plant, so YAZBEK decided in 2021 to make a gradual passage starting with the use of both plants at the same time until completely eliminating the "Chemical-Physical" plant by mid-October, leaving only the IDROSISTEM’s biological plant in operation.

Thanks to Idrosistem's wastewater treatment and recovery plant, Yazbek could recover up to 70% of the water that would normally end up down the drain. Currently only 40% of the water is recovered, due to the size of the Reverse Osmosis system (which was part of the previous existing plant).

 

 

Please feel free to download the complete Case Study Report from the links below. Kindly notice that the report is available in two versions: English and Spanish.

 